Tetra In Action #11 - December, 2017
Read about our 2018 Spring/Summer Training Schedule, a recent RCA project and Technical Tidbits from the HRSG Inspection Planning Guide
Tetra Engineering Group, Inc. has assisted the owners of natural gas-fired combined cycle plants with effective remedies to pressure part thermal performance and reliability issues since 1993. This includes some of the following 'firsts' for Tetra:
First HRSG Assessment
First Reliability Assessment - Standard HRSG OEM Design
First FAC Assessment for HRSG Tube Failures at Cogen
First High Energy Piping Inspection Plan
First HRSG Two-Shift Cycling Assessment
First HRSG Warranty Inspection
Third Party Review of Alternate TEG Distribution Grids
First HRSG Water Chemistry Training Seminar
1st HRSG Cost of Cycling Assessment
First CCGT High Energy Piping RCFA
First HRSG Purge Time Assessment
First Fuel Gas-Steam Pipe RCFA
1st HP ECON Tube RCFA
First Bowed RH Tube Evaluation
1st Ed., HRSG Tube Failure Diagnostic Guide
RH Tube RCFA - Fleet of Standard HRSG Design
Third Party Review of HRSG Harp Weld Quality
HRSG Design Review for Owner
1st Piping Stress Analysis - HRSG RH Piping
Field Support following CRH Waterhammer Event
First CCGT Pipe Support Inspection
1st Ed., HUG O&M Manual
1st 3D Knowledge Management System
1st Review of Attemeprator Spray Control Logic
First Hot Reheat Drainpot RCFA
First Evaluation of High Energy Steam Drain Capacity
HRSG Baseline - North Africa
PipeVue 1.0 - First KMS for Piping
HRSG and Steam Plant FFS - 10 Year Program
HRSG T23 Failure and Weld Quality
First Vertical Gas Path HRSG Tube RCFA
First Cost of Cycling Assessment
1st Ed., HRSG Inspection Planning Guide
1st Evaluation - Changed Main Steam Temperature
First HRSG RCFA Projects - Various Clients in Mexico
HRSG Component Reliability Database
1st HRSG EOH Assessment
1st NFPA 85 Improved Purge Time Evaluation
Third Party RCFA - Need for Chemical Cleaning
First Grade 91 Inspection Plan & Field Inspections
Engineering Review of Replacement Deaerator Design
HRSG Thermal Design Tool: PPSD - Various Projects
Design and Installation of Improved RH Header Restraint
First Onsite Water Treatment Program Upgrade
First HRSG Hot Spot Warranty Project - Ireland
1st FFS for Bulged CRH Piping Damage
Field Support - Main Steam Stop Valve Damage
First ACC Inspection and Thermal Performance Evaluation
First LP ECON Header RCFA - Middle East
1st CPS Piping Program - New ASME Requirements
First Deaerator Inspection and Condition Assessment
First FFS for Localized Thinning of FW Piping
First Casing Hot Spot Repair with Pumpable Insulation
1st ACC Inspection and Condition Assessment
Thermal Evaluation of RH Lower Link to Manifold Cracking
Seawater Contamination during Commissioning - Middle East
P91 Hot Reheat Lateral Inspection and RCFA
1st CFD Analysis of Perforated Plate in HRSG Duct
Third Party Engineering Review of OEM Re-Design of LP Evaporator
HRSG Damage and Remaining Life following Seawater Contamination
1st HRSG Warranty Inspection - Peru
Long Term Third Party Witness - Offshore HRSG Fabrication
1st P91 Risk Assessment & Inspection Plan - IWPP Plant
1st Benson Boiler HRSG Warranty Inspections
HRSG Outlet Manifold Creep-Fatigue RCFA
Main Steam Piping RCFA
PipeVue 2.0 - Released for Various Projects
Thermal Modeling - Prudhoe Bay Glycol Heating System
HRSG Vibration Study - Belgium
Tetra Engineering Middle East Opened - Dubai, UAE
1st Fleet-Wide HRSG Health Check Assessment
Survey of Industry 'Rust' Release Experiences after Startup
Engineering Design and Purchase Spec. for Alteration to HRH Lateral
1st UT Linear Phased Array Inspection in Mexico
3rd Edition, HRSG Tube Failure Diagnostic Guide
HRSG Beyond Design Lifetime Condition Assessment
Stress Analysis and Site Support for Alteration of HRH Lateral
NFPA-85 Purge Compliance after Alteration - SCGT
Duct Burner RCFA
1st CPS Piping Program - Canada
Engineering Study of HRSG Pre-Heat System for CO Emissions Control
First Condition Assessment for Once-Through SG - LM6000 Plant
Engineering Spec. for HRH Attemperator Upgrade
First Fleet-Wide CPS (High Energy) Piping Program
15 Year Re-Evaluation of HRSG Cycling Assessment
.....
Our thanks to our clients for their patronage over all these years.
Peter S. Jackson, P.E.PresidentTETRA ENGINEERING GROUP, INC.+1 (860) 651-4622 James W. MalloyPrincipal EngineerTetra Engineering Europe+33 (0)4 92 96 92 54
Stay up to date and refer to our large collection of technical white papers and articles
Read about our 2018 Spring/Summer Training Schedule, a recent RCA project and Technical Tidbits from the HRSG Inspection Planning Guide
Read about our 2018 Spring/Summer Training Schedule, a recent projects about Increasing HRSG Thermal Efficiency and some Technical Tidbits from our HRSG Inspection Planning Guide...
Grade 91 Damage Detection methods HRSG Inspections. Planned, periodic inspection of HRSG and associated steam cycle Balance of Plant is an essential component of a plant maintenance regime.
Read about Grade 91 Piping Risk Assessments, Thermal Simulations and our HRSG Inspection Planning Guide...