Restez au courant de nos derniers articles de presse
Since 2007, the ASME B31.1 Power Piping Code has included mandatory requirements on the Operation and Maintenance (O&M) of Covered Piping Systems (CPS), previously called High-Energy Piping. The main concern is that the safety of these systems is very dependent on good O&M, which justifies its inclusion in the Construction Code. There is room for flexibility depending on individual circumstances but the responsibility is squarely laid on the Operating Company.
Higher demands on outlet steam conditions has led to increased use of modified low alloy materials (9-12% Cr), such as Grade 91. The superior high temperature material properties of these types of steels (strength, fatigue resistance, creep resistance, improved steam oxidation resistance) gives the designer advantages with respect to boiler reliability and thermal performance. The advantages of using this type of materials are many; however, the long-term integrity has been a concern to the industry ever since the first installations.
Since 2007 the ASME B31.1 Power Piping Code has included Chapter VII, establishing mandatory requirements for Operation and Maintenance. The key elements of this program are discussed here, and require that Operators outline a detailed maintenance plan for their Covered Piping Systems (CPSs). The Code also requires that operators perform regular Condition Assessments of their CPS ensuring that relevant degradation mechanisms are being covered.
Consult our range of free resources