Actualités

Restez au courant de nos derniers articles de presse

New Dubai Office Open

Tetra Engineering has announced the opening of its new office in Dubai. We expect the improved proximity to our clients in the region will enable us to continue in delivering a better service. See our contact page for more details.

learn more

ASME B31.1 Covered Piping Systems' Mandatory Requirements

Since 2007, the ASME B31.1 Power Piping Code has included mandatory requirements on the Operation and Maintenance (O&M) of Covered Piping Systems (CPS), previously called High-Energy Piping. The main concern is that the safety of these systems is very dependent on good O&M, which justifies its inclusion in the Construction Code. There is room for flexibility depending on individual circumstances but the responsibility is squarely laid on the Operating Company.

learn more

Grade 91 Piping Risk Assessment

Higher demands on outlet steam conditions has led to increased use of modified low alloy materials (9-12% Cr), such as Grade 91. The superior high temperature material properties of these types of steels (strength, fatigue resistance, creep resistance, improved steam oxidation resistance) gives the designer advantages with respect to boiler reliability and thermal performance. The advantages of using this type of materials are many; however, the long-term integrity has been a concern to the industry ever since the first installations.

learn more

Tetra to present at EDF FAC 2013

Tetra will present their paper 'Evaluating Contributions of Flow-Accelerated Corrosion and Liquid Droplet Impingement to Pipe Thinning in HRSG Evaporator Tubes' at the EDF FAC 2013 conference, on Thursday 23rd at 10h35.

learn more

Tetra to present at ASME 2013 Power Conference

Tetra will present their paper 'Design Factors For Avoiding FAC Erosion in HRSG Low Pressure Evaporators' at this years ASME Power Conference in Boston, Massachusetts, USA. Session times will be posted as soon as they are confirmed.

learn more

Covered Piping System Maintenance Programme

Since 2007 the ASME B31.1 Power Piping Code has included Chapter VII, establishing mandatory requirements for Operation and Maintenance. The key elements of this program are discussed here, and require that Operators outline a detailed maintenance plan for their Covered Piping Systems (CPSs). The Code also requires that operators perform regular Condition Assessments of their CPS ensuring that relevant degradation mechanisms are being covered.

learn more

Boiler Process Modelling and Simulation

Tetra Engineering provides a full-scope service for the modelling and operation analysis of all types of natural or forced circulation Power Boiler and HRSGs, including supercritical and once-through designs.

learn more

Thermal Shock / Impingement Assessment

Many combined cycle power plants have experienced thermal shock damage to bypass power piping, especially in the HP steam and Hot Reheat systems.

learn more

Flexible Service Risk Assessment and Inspection Plan

The modern power generation market is very different to what it was ten or even five years ago.

learn more

Related Resources

Consult our range of free resources

HPSH Assembly

Papers, Presentations and Articles

A selection of papers, presentations and articles from major industry conferences and events.

Learn more

Technical Guides

learn more
SH Metallurgy

Technical Project References

A reference list of projects Tetra has been involved in.

Learn more

Technical White Papers

learn more

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter