Resources

Consult our range of free resources.

Contact Us

Technical Guides

Tetra has published a series of guides which are available for ordering.

HRSG Inspection Planning Guide (2nd Edition)

Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspections are performed at regular intervals in accordance with the requirements of regulatory bodies and insurers.

HRSG Tube Failure Diagnostic Guide (3rd Edition)

Heat Recovery Steam Generator (HRSG) tubes provide the media for extraction of useful energy from the waste heat in gas turbine exhaust at combined cycle power plants (GT-CCs) or from heat generated by process streams at petrochemical facilities.

Technical White Papers

A selection of technical papers available for reference.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
HRSG Inspection Planning

HRSG Inspection Planning

Building a good inspection plan for the HRSG involves doing the following: Set the Time and General Schedul...

learn more
Welding Procedure Specification (WPS)

Welding Procedure Specification (WPS)

Before any welding activity can commence, the welder and the QC Engineer has to be fully aware of the content ...

learn more
Post Weld Heat Treatment (PWHT)

Post Weld Heat Treatment (PWHT)

Post Weld Heat Treatment (PWHT) Background Post weld heat treatment is a post welding heating process used t...

learn more
Power Boiler Piping

Power Boiler Piping

Boiler piping design requirements is divided into internal and external jurisdictions. These are divided...

learn more
Creep Classification of Grade 91 Steel

Creep Classification of Grade 91 Steel

Background Grade 91 steel is superior to many other industry used materials for its increased resistance to m...

learn more
Remote Visual Inspection (RVI), or Borescope

Remote Visual Inspection (RVI), or Borescope

One of the first applications of the borescope was for inspecting steam turbine rotor discontinuities in the 1...

learn more

Contact Us

To discuss how we might assist you to improve your plant's performance or to maintain its value over time

Contact Us

Papers, Presentations and Articles

Selected papers, presentations and articles from major industry conferences and events.

Title
Author
What do HRSG tube failure statistics tell us?
What do HRSG tube failure statistics tell us?What do HRSG tube failure statistics tell us?
Misha Gadher & Mark Taylor
Modern Power Systems
Counterfeit, Fraudulent and Suspect Items (CFSI) – Steel and HRSGs
Counterfeit, Fraudulent and Suspect Items (CFSI) – Steel and HRSGsCounterfeit, Fraudulent and Suspect Items (CFSI) – Steel and HRSGs
Taylor M.
IMechE HRSG User Group 2022
Adapting Existing Thermal Desalination Plants to Produce Hydrogen
Adapting Existing Thermal Desalination Plants to Produce HydrogenAdapting Existing Thermal Desalination Plants to Produce Hydrogen
Malloy J.
2022 World Utilities Congress
Root Cause Failure Investigation of MSCV Drain Failures
Root Cause Failure Investigation of MSCV Drain FailuresRoot Cause Failure Investigation of MSCV Drain Failures
P. Jackson, A. Wholey, E. Tsai and D. Burns
ASME 2022 Pressure Vessels & Piping Conference
Predicting and Preventing Risk of Vibration Induced Failures in Boilers and Heat Recovery Steam Generators (HRSG)
Predicting and Preventing Risk of Vibration Induced Failures in Boilers and Heat Recovery Steam Generators (HRSG)Predicting and Preventing Risk of Vibration Induced Failures in Boilers and Heat Recovery Steam Generators (HRSG)
Fabricius A., Malloy J., Taylor M., Moelling D.
Proceedings of the ASME 2022 Power Conference

Previous Projects

With over 30 years of experience in power and industrial steam generation services, Tetra Engineering has along history of projects.

HP Evaporator Tube Failure Analysis, 2016
Middle East

HP Evaporator Tube Failure Analysis, 2016

During a recent condenser tube leak at a CCGT Power Station in the Middle East, two trips occurred on the boiler feedwater pumps leading to trips of one of the HRSGs.  During that time, three tubes failed on the HP Evaporator. Tetra Engineering performed an investigation into the failures with the aim of determining the failure mechanism, to estimate the root cause of failure, and to identify inspection priorities in case damage may have gone undetected. This work included metallurgical analysis and a review of key operating data. Failures were located directly under the risers at extreme ends of the HP Drum. The most probable source of tensile overload is tube quenching when flow restarted

Attemperator Sleeve Failure Study, 2016
Europe

Attemperator Sleeve Failure Study, 2016

In 2015, it was discovered that the thermal sleeve in the attemperator in a client’s power station hot reheat line had failed, resulting in fracture around the circumferential weld in the sleeve’s mid section. For this reason, Tetra was engaged by the owner to investigate. The investigation showed failure from fatigue cracking. There were no signs of thermal fatigue damage, hence quenching from over-spraying was discounted as the root cause. The cracked area showed signs of high cyclic local strain, and given the moderate number of starts low-cycle fatigue was thought to be the root cause. Differential thermal expansion between the Grade 22 sleeve and the Grade 91 pipe, combined with lock-in of the sleeve on the pin locations, would raise sufficiently high stresses

HP Bypass Finite Element Analysis, 2015
Europe

HP Bypass Finite Element Analysis, 2015

Tetra was engaged by a client to perform a finite element analysis of the HP Bypass valve reducer, using measured displacements as input. Results from a strain gauge/displacement survey showed a large strain effect occurring during the start-up of the boiler. Initially, both the left and right side strain gauges on the reducer showed compressive strain. During the start something triggered the reducer to experience tensile strain that differed in its intensity between left and right. The purpose of the study was to try to simulate the observed strain fields and determine the root cause.

Site Condition Assessment, 2015
South East Asia

Site Condition Assessment, 2015

A Tetra Senior Engineer visited a south east asian power plant site to make an assessment of the commissioning situation. The EPC engaged Tetra as they considered that their site work was being delayed due to lack of progress by the IPP to perform their scope of work.There was significant lack of communication between the two parties as well as discrepancies in the scope of work, which lead to schedule delays and cause of mutual blaming between parties.

Contact Us

To discuss how we might assist you to improve your plant's performance or to maintain its value over time

Contact Us