Stay up to date with our latest news articles
The latest updated edition of Tetra Engineering's HRSG Tube Failure Diagnostic Guide will be published August 15, 2016. Thousands of combined cycle professionals are familiar with Tetra's HRSG Tube Failure Diagnostic Guide; first published during the 'bubble' in construction in the early 2000s.
OEM upgrade packages to gas turbines (GT) can significantly improve performance, operational flexibility and increase outage intervals. In combined cycle power plants, the impact of these upgrades should also be considered for the HRSG where the design was based on the original GT performance.
How low can you go? That’s the question owners of gas turbine combined cycle plants are asking these days as they are being called upon to operate those units for rapid response in markets where load following is becoming the norm. The resulting cyclic operation introduces challenges that can result in damage to steam cycle components if you aren’t careful.
Tetra Engineering provides services to assist Cement Plant Owners and Operators in implementing, maintaining and improving all types of Heat Recovery Systems. Our Heat Recovery Steam Generator and steam cycle services have been applied to Rotary Kiln Waste Heat recovery power generation systems. Whether addressing problems with fouling, or assessing plant modifications for performance improvements, contact Tetra to reduce your energy costs and increase reliability.
Consult our range of free resources