Ressources

Consultez notre gamme de ressources gratuites.

Nous contacter

Guides techniques

Tetra a publié une série de guides qui peuvent être commandés.

HRSG Inspection Planning Guide (2nd Edition)

Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspections are performed at regular intervals in accordance with the requirements of regulatory bodies and insurers.

HRSG Tube Failure Diagnostic Guide (3rd Edition)

Heat Recovery Steam Generator (HRSG) tubes provide the media for extraction of useful energy from the waste heat in gas turbine exhaust at combined cycle power plants (GT-CCs) or from heat generated by process streams at petrochemical facilities.

Article Techniques

Une sélection de documents techniques disponibles à titre de référence.

Merci ! Votre candidature a été reçue !
Oups ! Une erreur s'est produite lors de l'envoi du formulaire.

HRSG Inspection Frequency

Effective maintenance scheduling and planning is critical to completing required work during outages and preve...

en savoir plus

Tube Metallurgical Analysis

What is normally included in a metallurgical analysis? Visual examination may be obvious, but there is a ...

en savoir plus

Visual HRSG Inspections

The predominant technique for inspecting HRSGs is visual. Visual inspection is performed at nearly every...

en savoir plus

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter

Articles, présentations et articles

Sélection d'articles, de présentations et d'articles issus de conférences et d'événements majeurs de l'industrie.

Title
Author
Computer Simulation of HRSGs Can Improve O&M
Computer Simulation of HRSGs Can Improve O&MComputer Simulation of HRSGs Can Improve O&M
J.W. Malloy (Tetra), C. Daublebsky (KED)
Jun 1 , 2009, Power Magazine
Experience of using pumped casing insulation in an operating Heat Recovery Steam Generator
Experience of using pumped casing insulation in an operating Heat Recovery Steam GeneratorExperience of using pumped casing insulation in an operating Heat Recovery Steam Generator
Tetra Engineering
2008, POWERGEN INT., USA
Deaerator degradation: Managing remaining life and component replacement
Deaerator degradation: Managing remaining life and component replacementDeaerator degradation: Managing remaining life and component replacement
P.S. Jackson (Tetra ) and T. Acteson (Chugach Electric Association)
Sep 15, 2008, Power Magazine
Extend EOH tracking to the entire plant
Extend EOH tracking to the entire plantExtend EOH tracking to the entire plant
P.S. Jackson, D.S. Moelling (Tetra)
Mar 15, 2008, Power Magazine
FAC Analysis for Inspection
FAC Analysis for InspectionFAC Analysis for Inspection
M.J. Taylor (Tetra)
2007, Heat Recovery Steam Generator User Group, UK

Projets Récents

Avec plus de 30 ans d'expérience dans les services de production d'électricité et de vapeur industrielle, Tetra Engineering a une longue histoire de projets.

South East Asia

Stress Analysis Study of SH Section, 2014

A CCGT Power Plant suffered repeated tube failures between 2003 and 2014 in the SH section of their boiler. Failures were exclusively located at the tube-header weld, at varying positions on the tube sheet. The client engaged Tetra Engineering to analyze the problem and simulate the existing stresses during various load conditions. The scope of work included a review of historical failures and metallurgical reports, operational data analysis, Finite Element Analysis (FEA) and Fatigue Analysis.

Europe

HRSG Vibration Study, 2013

A HRSG operated by a European client appeared to be subject to excessive vibration, based on high noise near the unit and vibration of the casing in certain sections of the roof.  The OEM and EPC had initially agreed that the vibration was a potential problem, so for this reason a study was commissioned by them. This included a field survey of noise using microphones, confirming that there were high noise levels in three different frequencies at some points outside the HRSG casing. Subsequently the OEM/EPC modified their position to hold that the observed noise was not a problem and that no further action was required. The client then requested that Tetra Engineering independently review the problem and perform additional analysis as required. The scope of work included field measurements, thermohydraulic boiler simulations and vibration risk calculations.

Middle East

CFD Analysis of failed 180° Bend, 2013

A CFD study on one of the 4th quadrant pipe bends at a thermal power plant steam boiler was performed. The purpose of the analysis was to analyse the change in flow velocity due to an increase in the bend nominal size from 3” to 4”. The connecting pipe run was kept at 3” and standard expander/reducers are used to join the pipe with the bend. Input process parameters were taken from a PPSD model.

Middle East

LP Economiser Header Failure Analysis, 2010

The LP economiser lower header on a HRSG ruptured shortly after a diverter damper incident. Tetra was approached by the client to investigate the possible root causes for the rupture. The unit went into single element control at the time of the incident and the LCV cycled through fully open / fully closed positions to maintain the drum level after “shrink”. When the damper re-opened the LCV remained closed as the drum level increased (swell). The economizer temperature increased and there was an associated increase in pressure. The safety valve failed to operate as it was accidentally gagged, causing serious over pressurisation and a burst header.

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter