Ressources

Consultez notre gamme de ressources gratuites.

Nous contacter

Guides techniques

Tetra a publié une série de guides qui peuvent être commandés.

HRSG Inspection Planning Guide (2nd Edition)

Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspections are performed at regular intervals in accordance with the requirements of regulatory bodies and insurers.

HRSG Tube Failure Diagnostic Guide (3rd Edition)

Heat Recovery Steam Generator (HRSG) tubes provide the media for extraction of useful energy from the waste heat in gas turbine exhaust at combined cycle power plants (GT-CCs) or from heat generated by process streams at petrochemical facilities.

Article Techniques

Une sélection de documents techniques disponibles à titre de référence.

Merci ! Votre candidature a été reçue !
Oups ! Une erreur s'est produite lors de l'envoi du formulaire.

HRSG Inspection Frequency

Effective maintenance scheduling and planning is critical to completing required work during outages and preve...

en savoir plus

Tube Metallurgical Analysis

What is normally included in a metallurgical analysis? Visual examination may be obvious, but there is a ...

en savoir plus

Visual HRSG Inspections

The predominant technique for inspecting HRSGs is visual. Visual inspection is performed at nearly every...

en savoir plus

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter

Articles, présentations et articles

Sélection d'articles, de présentations et d'articles issus de conférences et d'événements majeurs de l'industrie.

Title
Author
Chemical Cleaning of HRSGs: When, Where and How?
Chemical Cleaning of HRSGs: When, Where and How?Chemical Cleaning of HRSGs: When, Where and How?
Malloy J.
European HRSG Forum, Munich, 2015.
Role of Boiling Mode and Rate in Formation of Waterside Deposits in Heat Recovery Steam Generator Evaporator Tubes
Role of Boiling Mode and Rate in Formation of Waterside Deposits in Heat Recovery Steam Generator Evaporator TubesRole of Boiling Mode and Rate in Formation of Waterside Deposits in Heat Recovery Steam Generator Evaporator Tubes
Moelling D., Malloy J.
ASME POWER 2014 Conference, July, 2014.
Evaluating Contributions of Flow-Accelerated Corrosion and Liquid Droplet Impingement to Pipe Thinning in HRSG Evaporator Tubes
Evaluating Contributions of Flow-Accelerated Corrosion and Liquid Droplet Impingement to Pipe Thinning in HRSG Evaporator TubesEvaluating Contributions of Flow-Accelerated Corrosion and Liquid Droplet Impingement to Pipe Thinning in HRSG Evaporator Tubes
Malloy J., Graham M., Taylor M., Fabricius A., Moelling D.
EdF FAC Conference Avignon, May 2013 and Power Plant Chemistry 2013
Design factors for avoiding FAC erosion in HRSG low-pressure evaporators
Design factors for avoiding FAC erosion in HRSG low-pressure evaporatorsDesign factors for avoiding FAC erosion in HRSG low-pressure evaporators
Malloy J., Taylor M., Fabricius A., Graham M., Moelling D.
July 2013, ASME POWER Conference, USA
Ten Year Retrospective Look at HRSG FAC Assessment and Incidence
Ten Year Retrospective Look at HRSG FAC Assessment and IncidenceTen Year Retrospective Look at HRSG FAC Assessment and Incidence
P.S. Jackson, D.S. Moelling, M.J. Taylor (Tetra)
Jul 1, 2010, Fossil FAC International Conference, USA

Projets Récents

Avec plus de 30 ans d'expérience dans les services de production d'électricité et de vapeur industrielle, Tetra Engineering a une longue histoire de projets.

Middle East

Field Assessment of Piping Water Hammer Event, 2014

Tetra Engineering was asked to assess the situation after a significant water slug/hammer event. Observations made during the site visit showed that the structural members were severely damaged with steel being heavily deformed and torn in some cases.  Piping supports were also severely damaged and would require repair.

Middle East.

LP EVAP Tube Failure Analysis, 2014

Tetra Engineering was asked by a client to help to assess the cause of tube failures in the upper section of the LPEVAP on their HRSG units. The first tube failure was reported in 2010; other failures have followed since then at a rate of two to three per year. At the time of the first failure the plant had been operating for approximately three years. Tetra performed a root cause analysis which included a review of water chemistry logs, boiler simulations using PPSD as well as a FAC Risk Assessment.

Middle East

HRSG Boiler Preservation Study, 2014

A CCGT power plant employed Tetra to perform a review of possible boiler preservation options within the context of the present and planned operating regime. The review relied on information supplied by the plant staff, Tetra field experience and latest industry trends and practices to identify the most promising strategy for preservation. The ideal solution for this client was Dry Layup that is systematically applied when it reaches the end of the standby period. This would require that resulting startup timing meets requirements imposed by the governing network operator.

Europe

Thermohydraulic Attemperator Study using PPS&D, 2014

The primary purpose of this study was to validate the effect of an interstage attemperator between two superheaters with respect to the primary superheater and primary reheater outlet steam temperatures. The CCGT in question had already had problems with creep failures of the P91 components, and needed to assure that exit temperatures did not exceed 570°C. Currently, the primary superheater outlet temperatures exceed 600°C at certain loads and the primary reheater temperatures exceed 590°C. Initial results were based on steady-state analysis, while final results included dynamic modeling of cold-, warm- and hot starts, as well as ramp up and ramp down. The study was performed using the software simulation tool PPS&D.

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter